FAQ No. FAQ00743
Question
How is the electrode or electrode band
mounted to the PS-[]S Electrode Holder, and what parts are required?
Answer
Number of Parts Required During Installation
(Bar Electrode)
Automatic Water Supply or Drainage Control
(Example)
Number of Parts Required When E1 = 1 m, E2 = 2 m, and E3 = 3 m:
|
61F-GN: |
1pc |
| PS-3S: |
1pc |
| F03-01 (SUS304): |
6pcs |
|
F03-02 (SUS304): |
3pcs |
|
F03-03 (SUS304): |
9pcs |
| F03-14 3P: |
1pc |
| F03-14 1P: |
1pc |
Refer to F03-[] Electrodes
and Accessories for more details.
Number of Parts Required During Installation
(Electrode Band)
Automatic Water Supply or Drainage Control (Example)
Number of Parts Required for
a 3-m Electrode Band:
| 61F-GN: |
1pc |
| PS-3S: |
1pc |
|
F03-06: |
3pcs |
|
F03-05 3P: |
3m |
| F03-07: |
4pcs |
| F03-08: |
2pcs |
| F03-09: |
2pcs |
| F03-10: |
1pc |
Other Level Controller
FAQs
Are there any precautions to observe when controlling pure water with a 61F Controller?
What kind of wiring is best to combine a 61F-GP-N Controller and float switch?
Is it possible to connect more than one 61F Controller to the same electrodes and share the electrodes?
|